equipo de crematorio para mascotas

Finalmente, se debe apagar el vapor a la chaqueta, se debe abrir la puerta de …

Le comté abandonne les projets d'incinérateur de valorisation énergétique...

Le conseil des commissaires de comté a annulé jeudi les projets d’un incinérateur régional de …

Incinerator Primary Combustion Chamber

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial  trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures,  eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal  for military and civil camps and remote locations where infrastructure is scarce. Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with  other disposal methods. Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid  cross-contamination risk and to keep waste treatment costs at acceptable level. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Website: www.hiclover.com   Email: [email protected] Email: [email protected] …

Refractory constructions incinerator

* Burning Rate                                                     (50-120kg/hour) * Minimum Operating Temperature                (850°ϲ(Primary combustion) * Maximum Operating Temperature               (1450°ϲ(Afterburner chamber) * Secondary Burning Capacity                         (Compulsory) * Density Insulation                                           (20mm high) * Refractory Casting                                          (Minimum 65mm) * Heavy duty refracting lining to withstand    (1500°ϲ) * Average burn out time: Maximum                (3.0 hours) * Fuel Type                                                          (Diesel) * Fuel Consumption in L/hr:                            (7.5 to 9) * Residence time in secondary chamber     (2 sec.) * Residue ash post 100kg                               (Max. 3.8kg) * Installation period                                            (Maximum 7days) Type : Refractory constructions Steel Structure 400+ Silica board + Fire Brick and …

England’s Garbage Producing Danish heat

“They save on having to bury the waste and we save on the consumption of …

50-100-150-200 Kgs per Hour Solid Waste Incinerator Model TS150...

Waste Incinerator Model TS150 PLC, Overview This model is small-scale waste incineration equipment for small …

Ébola: la empresa de Southport lidera la lucha en...

El gerente de ventas y marketing Paul Niklas dijo que tenían más de cien pedidos …

machine à jeter les déchets médicaux chauds, état de...

machine à jeter les déchets médicaux chauds, état de fonctionnement: 8-16 h / jour Contrôle: …

hiclover 10kgs per hour incinerator

Smallest waste incinerator for small hospital  average 10kgs per hour.  with double(2) sets burner. Equipment …

diseño de incinerador médico

Se espera que el Licitante coopere estrechamente con PATH y los Hospitales objetivo para el …

FFP2 Breathing mask machine

平面口罩机参数: Semi-Automatic Mask Machine l Power supply: 3.3KW mono phase l Mask Size: 175mm*80-100mm (two or three layers) …

ТЕХНИЧЕСКИЕ ХАРАКТЕРИСТИКИ ИНСИНЕРАТОРА Производительность ДО 20 кг / час

Размер: 940 x 860 x 2700 мм Материал: СТЕК ИЗ НЕРЖАВЕЮЩЕЙ СТАЛИ, ФУТБОЛКА ИЗ ОГНЕБЕТОНА …

محرقة

وصف المنتج استجابة التكنولوجيا (الأسئلة الشائعة) س: ما نوع النفايات التي يمكن استخدامها في هذا …

Inaugurada planta de manejo de dejetos animais em Marsa

A nova planta ajudaria na redução das perdas de energia no processo de incineração, bem …

N95 Face Mask Machine Production Line on Sale Now!...

N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set N95 Face Mask …

L'opérateur de l'incinérateur de déchets de Burnaby poursuivi en...

Le Greater Vancouver Sewerage and Drainage District poursuit Maxxam Analytics International Corp.et Covanta Burnaby Renewable …

Melt blown Production Line 400mm and 1600mm and ES...

1. N95 and Disposable Mask Machine   2. 400mm and 1600mm Melt blown Production Line …