Burning Capability: 125 kg minimum/time (3-6times/ day), dual chamber, dual combustion system
Imputing door Mouth Width (mm): 760 * 760 (approx.).
Smokeshaft External Size (mm): 300 ± 10.
Combustion Improver Device: 0.11 kw, Fuel intake: 7kg/ hr (max).
Re-Burning Tool: Oil consumption: 5kg/h, 0.37 kw, Oil consumption: 10-20kg/ h.
Voltage: 380v/220v Air Conditioner, Service Warranty: 1 Year, 50 Hz

Per your advertisement for 300 kg.hr. Version– We need to know the rate through return.

The amount of Kg. of Gas would be required for running this Design 10 hrs. day-to-day.

We have our own Freight Forwarding Agent.

We had a Contract for Rubbish Monitoring prior to their Civil Battle for 120 Tons/Day for one Town in North Africa.
Medical Waste Burner

Twin Chamber (Main & & Secondary) with insulation pieces (completely insulated inner refractory lining) in addition to

regulated air blower for each chamber

Insulation/ Refractory Thickness: ≥ 100mm

Chamber plate thickness: ≥ 6mm

Fuel Kind: Natural gas based on shedding fuel in combustion chambers

Waste Ability: ≈ 150 Kg/Day

Incineration capacity: ≈ 25 Kg/Day (Different waste billing as well as waste elimination doors)

Burners: At the very least with (02) burners of automated begin and quit functions

Combustion efficiency: > > 97%

Temperature: programmable temperature with temp monitoring system

Residence time: 2 2nd in secondary chamber

Heating value: 4000 Kcal

Temperature Level Variety: ≈ min 800ºC to max 1200ºC

Electrical supply: 220V with solitary stage

Smokeshaft Plate Thickness: ≥ 5mm

Water scrubber: Rubbing making use of reagent like lime & & must made of SS 10 gauge of non-corrosion properties and painted